I have a panel with 6pumps. Will it be a tricky to do a circuit to run all the pumps depending on the level of a tank, so as the level drops a pump will run if the level continues to drop another pump will come on, this part i think i can do but the customer wants to rotate the lead pump daily and this is the bit i can't get my head around.